Design Analysis & Maintenance of 105m guyed structure – On Going
Country : Qatar
End User : Ministry of Interior
Client : Zone Technology
Complete design analysis of the 105m structure
Replacement of 12 Nos. of Vertical Guy Wires along with end socket (located between 30m and 45m). The results of the design analysis will be used to select the correct guy wires & termination accessories based on the suitable properties for the mast stability.
Re-tensioning of all guy wires of the structure
Check and maintain the verticality (Plumb & Twist) of the tower within the allowable tolerance