Installation of FM Transmitter systems in Emirates Tower &
Al Mas tower
Country : United Arab Emirates
End User : Arabian Radio Network
Client : Rohde & Schwarz Middle East & Africa
Emirates Tower:
Dismantling of existing transmitter system including transmitters, combiners and Program Input & Monitoring Equipment racks
Installation of two number of 5kW FM transmitter systems in 5+1 configuration (12 Transmitters), combiners, RF splitter & coaxial patch rack, Program Input & Monitoring Equipment racks, remote monitoring system and automatic takeover system
Installation of 70kVA UPS and power distribution boards for the FM transmitter systems & PIME racks.
Inspection of FM antenna system and feeder cables at top of the Emirates tower
Al Mas Tower:
Installation of 20 kW FM transmitter, combiner, dummy load and Program Input & Monitoring Equipment.